Sorting will take bout 2 weeks then its done
I will probably settle for cat 7
Like cat 8 is what i need
But like cat 7 is basically enaugh, like
I can’t think of a application which requires more than 10gb
Like it makes everything cheaper too
So i basically get a ikea table, cable, connectors, pliers,
These mounting rails
And some slide in shelf drawer things
And a switch
I am really bored tho
Like after the hair cycle is implemented
Like bout a week i think
I’ll make a list with my benefits for getting another job, and then go apply
And while i apply i look into what traveling the country would cost me
Like can i get a budget for like randomly going traveling on a weekend already,
Or do i need to wait till the next job
Leave a Reply